The death and destruction caused by the deadliest single tornado in Missouri’s history was indescribable. Mercy Joplin sustained a direct and devastating hit by an EF 5 Tornado that cut a mile wide path of devastation across the densely populated south central part of Joplin. A mere 24 minutes later the unthinkable happened. on May 22 the National Weather Service issued a tornado warning for the Joplin area. There were storms brewing in southeast Kansas and severe weather watches, but that is par for the course for late spring in “Tornado Alley.” John’s Regional Medical Center (Mercy Joplin). May 22, 2011, started out as a not too unusual Sunday afternoon in Joplin, Mo families playing in the park, high school graduation underway at the football stadium, bustling emergency departments at the local hospitals, and an emergency orthopedic case in progress at St. This project represents hope, and it has been an honor to be a part of it.You may have forgotten the date, but we all remember the event. “We are so proud to be able to deliver this world-class facility to the Joplin community. “The new Mercy Hospital Joplin exemplifies teamwork, commitment and innovation,” Ryan Felton, McCarthy project director said. To create ease of access to the new hospital, McCarthy also built new entrance ramps, exit ramps and interchanges for the Missouri Department of Transportation, as well as a new road leading up to the facility. The generator system will enable the hospital to operate for 96 hours if power is lost. To protect critical hospital systems, the utility plant was built halfway below ground to limit exposure to the elements. High-impact, laminated glass was incorporated throughout the facility along with protected evacuation routes.Ĭonnected to the hospital by a 450-foot underground tunnel is a 30,000-square-foot central utility plant containing all mechanical, electrical and plumbing systems. “For example, we designed protected evacuation routes, incorporated high-impact glass and protected critical systems throughout the hospital.”Ĭritical areas of the hospital, such as the emergency department and intensive care unit, have windows rated to withstand 250 mph winds. “The team used lessons learned from the disaster and experience working in coastal regions to design and build a safer, more secure facility,” said Norman Morgan, AIA, HKS principal-in-charge. The new hospital incorporates many resiliency elements to help withstand another natural disaster and provide a safe environment for patients, staff and visitors. Headwalls and restroom walls for all patient rooms built out were constructed in a warehouse and installed later in the construction process. Prefabrication also enabled McCarthy to accelerate the construction. Mercy, HKS and McCarthy utilized Building Information Modeling to avoid potential issues in the field. It houses units including medical surgical, critical care, women’s/children’s (labor, delivery, recovery and postpartum rooms), neonatal intensive care, behavioral health and rehab. The new 890,000-square-foot facility includes a nine-story hospital patient tower and five-story clinic tower. and Archimages, and MEP engineer Heideman & Associates joined together to assist Mercy in any way necessary. The team of construction manager McCarthy Building Companies, Inc., architectural firms HKS, Inc. President and Chief Operating Officer Scott Wittkop. “From the first few moments after the tornado tore through Joplin, staff from McCarthy and HKS were on the ground to offer immediate assistance,” said McCarthy Building Companies, Inc. John’s Mercy Regional Medical Center in Joplin, Missouri. The $465-million (total project cost), 205-private room hospital replaces the former St. since 1947 – the new Mercy Hospital Joplin is set to open its doors to patients on March 22. Demolished in the May 22, 2011, EF-5 tornado – the deadliest tornado in the U.S.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |